Inspection: Suttin & Ceidar Consulting Group Inc.
Project Scope: To design and build British Columbia’s first large scale debris barrier located upstream of Whistler Village to protect it from a full force debris flood by effectively slowing the velocity of the flood and detaining up to 34,000 cubic meters of debris and withstanding the impact equivalent to a 2.8-ton boulder travelling at 5 metres/second.